A new water treatment plant in Hill City, MN, designed to handle a capacity of 200 gallons per minute (GPM). The project includes a new treatment structure equipped with advanced filtration systems, automatic backwash equipment, and all necessary process piping. Key components of the facility include a 75,000-gallon Clearwell and a 21,000-gallon backwash waste tank.
The scope of this project also includes installation of chemical feed systems, associated electrical and SCADA system upgrades, a standby generator, and complete mechanical systems. Additional work involves the replacement of existing well pumps, site grading, and comprehensive site utility improvements to support the new infrastructure.