Pennslyvania State University, West Campus Substation Replacement

Project Description

This project included installation of a new 12.47 kV double ended sub/switch station for replacement and upgrade of the West Utility Distribution for campus. it also included fiber connections and SCADA integration for a new generation control system for the project. McGough led regular coordination and installation logistics meetings with the local utility provider, West Penn Power, and the University’s utility crews and building facility coordinators. McGough was responsible for MV cabling, terminations and testing along with coordinated cutover sequences documented by detailed Method of Procedures (MOPs) to ensure zero unplanned interruptions. Upon successful cutover completions, McGough decommissioned and demolished the existing West substation. The project included 1,000 LF of concrete encasement and duct bank and 5,700 LF of fiber.

Architect: KFI Engineers

Location: State College, PA 

Completion: 2020

Power + Infrastructure

Since our founding in 1956, McGough has collaborated with a wide range of Power and Infrastructure clients. We continuously innovate our project approaches resulting in superior outcomes and exceptional experiences for our clients.

To learn more about McGough's Power and Infrastructure expertise, contact one of our team members to the right.

More Projects

Tim Eickman

Director, Preconstruction, Power and Infrastructure

Jesse Turner

General Manager, Industrial

This website uses a variety of cookies, which you consent to if you continue to use this site. You can read our Privacy Policy for details about how these cookies are used, and to grant or withdraw your consent for certain types of cookies.